Kelly and i popped over to the plot on Monday (6th July) afternoon to discover the slab frame had been completed which gives a bit more of a visualisation on the size of the house. Whilst there we were met by a chap who was to perform a 'slab frame inspection' prior to pouring the concrete at 6am the following day. Sure enough, I drove by at 06:10 today (Tuesday) and was greeted by 3 Mack Cement trucks pouring the slab.